- Open the accumulator example. AC1 starts with no oil and a 50 bar gauge gas precharge.
- Run the 20-second capture. Choose AC1 pressure: it rises while oil compresses the gas.
- Move the time cursor and select AC1 to inspect stored oil volume.
- Select RV1 in the flow trace. It begins bypassing pump flow once the accumulator approaches the relief setting.
- In Sizing → Accumulator, enter the same volume and precharge to compare usable oil between two pressures.
The checklist records your learning progress. It is not an engineering acceptance test.